Mainrich International

Manufacturing in China, run from London

How we work

Send the drawing. We get it made in China and checked before it ships.

Mainrich is a family business founded in 1994. We review your drawing, work with the plants in Chinese, inspect the parts against your print and organize the export paperwork and shipping.

You deal with one company, in English, with account and engineering support based in London.

Magnet drawing? Upload it to the drawing check and confirm what we read from it before you send it.

Coordinate-measuring machine probing finished magnet parts
Finished magnet parts measured on a coordinate-measuring machine.
An inspector checking a part with a dial indicator
A dial-indicator check on a part.

Why buyers come to us

Buying from a factory you found online

Plenty of factories in China make good parts. What buyers in Europe and the US tell us they worry about is what will actually arrive: whether the factory read the drawing the way it was meant, whether production matches the sample, and who answers when something is off. We sit between you and the plant and take that on.

What we do

One company between your drawing and the plant

  • Engineering review

    An engineer reads the drawing before any plant sees it. We check the grade against your operating temperature and the tolerances against the process, and we ask about anything the drawing leaves open, such as magnetization direction or quantity per part, rather than guess.
  • Factory work in Chinese

    Parts are made in China. Our team in Zhongshan works with the plants in Chinese, so revisions and questions reach the people making the part in their own language.
  • Inspection to your print

    Critical dimensions are measured against the drawing, and magnetic parts are flux-mapped where the part calls for it. The inspection plan and the records you receive are agreed for each part.
  • Export paperwork and shipping

    Grades up to N52SH can be made without a Chinese export licence, so we offer those first; UH and EH grades need a licence, applied for per order. Each shipment is classified with the exporter, and the shipping terms are set in the quotation.

How a job runs

From drawing to delivery

Timings for assemblies and other parts are confirmed in the quotation.

01

Drawing
Send the drawingSTEP or PDF, with the quantity per part, the operating temperature and the date you need parts. A sketch and a performance target are enough to start.

02

Reply
A person repliesWithin 1 business day, with questions on anything the drawing leaves open. Pricing for standard requests follows within 2 business days.

03

Samples
Usually 10 to 15 days for sintered NdFeB, or 20 to 25 days with testing. You check them before production starts.

04

Production
Usually 30 to 35 days for sintered NdFeB, with urgent orders by arrangement. Any export licence step and the transit time are confirmed in the quotation.

05

Inspection
Inspection and shippingParts are inspected to the agreed plan before they leave the plant, then shipped on the terms in the quotation.
A magnetic field measuring station

Inspection

Checked before it ships

Human reply
1 business dayA person reads the drawing and writes back, with questions on anything it leaves open.
Pricing
2 business daysFor standard requests.
Samples
10 to 15 daysSintered NdFeB, or 20 to 25 days with testing.
Production
30 to 35 daysSintered NdFeB; urgent orders by arrangement.

Questions buyers ask

Before you send a drawing

Do you own the factories?
No. Mainrich is an engineering and sourcing partner that holds equity stakes in a production network in China. We coordinate the engineering, quality requirements and delivery for your part, and the supplying entity and certificate scope are confirmed for each order.
Who will I deal with?
Account and engineering support is based in London, and the China team works from Zhongshan. One person replies to each new enquiry, so you get one answer, in English.
How long do samples and production take?
For sintered NdFeB, samples usually take 10 to 15 days (20 to 25 days with testing) and production 30 to 35 days, with urgent orders by arrangement. Timings for assemblies and other parts are confirmed in the quotation, together with any export licence step and the transit time.
Do I need a Chinese export licence?
Grades up to N52SH can be made without a Chinese export licence, so we offer those first; UH and EH grades need a licence, applied for per order. Each order is classified with the exporter from the material and the finished item.
Can you make parts other than magnets?
We start with the motion parts we already supply: magnets, rings and magnet assemblies. Send the drawing for anything else, and the first reply says whether we can make it.
What does it cost to ask?
Nothing. The drawing review and the first reply are free, and there is no fixed minimum for sintered NdFeB; the quotation sets it per part, by grade, size and weight.

Send a drawing

Send the drawing and the quantity you need.

STEP, PDF or DWG, or a sketch with a performance target. A person replies within 1 business day, with pricing within 2 business days for standard requests.

Rather talk it through first?

Book 30 minutes with our engineering team to go over the drawing, the export path and the production route.

Available Mon-Fri, 9AM-6PM GMT / HKT

Email
contact@mainrichinternational.com
London
+44 7576 906041